Zijin gold recovery plant in Akmola Region granted simplified environmental assessment
In Akmola Region, Zijin Mining's 10-million-tonne-per-year gold processing plant was approved via a simplified environmental review, bypassing a mandatory environmental impact assessment.
The decision was made on the initiative of the prosecutor's office so that preparatory work would not be pushed back to April 2027, while, according to it, environmental requirements remain in place, reports the prosecutor's office of the Akmola region.
The essence in brief
- The volume of foreign investment in the project is over $600 million, the plant is designed for 10 million tons of ore per year.
- Lengthy environmental procedures, according to the prosecutor's office, could have pushed preparatory work back to April 2027.
- On the initiative of the prosecutor's office, the authorized body decided to apply a simplified procedure for environmental assessment without a mandatory EIA.
- Completion of the procedures and implementation of the project, as the prosecutor's office reported, remain under its control.
What the prosecutor's office reported
According to the prosecutor's office, a procedural obstacle to the implementation of a major investment project by the international company Zijin Mining has been removed in the region. The project provides for the construction of a gold recovery plant with a capacity of 10 million tons of ore per year with foreign investments of over $600 million. The agency believes that its implementation will strengthen the country's industrial potential, create jobs and increase tax revenues.
The need to undergo lengthy environmental procedures created a risk of postponing preparatory work to April 2027 and delaying construction. On the initiative of the prosecutor's office, the authorized body decided to apply a simplified procedure for environmental assessment without conducting a mandatory EIA. The obstacle that affected the timeline for attracting investment was removed while environmental requirements were preserved. Which body made the decision and what steps the simplified procedure consists of is not specified in the report.
What is known about the project itself
The prosecutor's office did not name the deposit. A plant with the same capacity and investment volume, as the akimat of the Akmola region reported in September, is being built by Zijin RG Gold at the Raigorodok deposit in the Burabay district. According to the akimat's report, it will process up to 10 million tons of ore per year, and the total capacity of the complex will grow to 16 million tons. The increase in output is estimated at approximately 7 tons of gold per year, and the company's total production should grow from 6 to more than 12 tons of doré alloy annually.
The project includes power and water supply, tailings management, transport, warehouses and a rotational camp for 400 people. The akimat wrote in September that implementation of the project had already begun, while the prosecutor's office speaks of a risk of postponing preparatory work. At what stage the work is now is not clear from these reports.
What is happening with gold and environmental assessment in the region
Gold output in Kazakhstan over nine months declined by 11%, to 84.7 tons, while gold reserves in 2024-2025 grew by 157,210.6 kg. In the same Akmola region, gold at the Atasu site will be explored until 2032, and Kaz Zinc expects to receive about $4.4 billion from gold mining at the Vasilkovskoye deposit. As for environmental assessment, Uzbekistan is reforming the EIA and studied the experience of 11 countries, including Kazakhstan.
Author's conclusion
The prosecutor's office describes the decision as the removal of a procedural obstacle rather than the abolition of environmental requirements, but its report does not show which body made the decision or how the simplified procedure differs from a full EIA. These details will show how justified the replacement is. For now, it is known that the procedures for the project have not yet been completed and remain under the control of the prosecutor's office.
Comments ()